The Smartsearch system was used extensively over a long campaign covering the UXO survey, along 3 planned cable routes for a new Offshore Wind Farm. Phase 1 of the survey has been conducted with simultaneous processing, interpretation, and reporting, both offshore and onshore by the end customer. Phase 2 is planned for completion during 2020.